NCARB PDD ARE 5.0 Project Development and Documentation Exam Exam Practice Test

Demo: 30 questions
Total 100 questions

ARE 5.0 Project Development and Documentation Exam Questions and Answers

Question 1

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

Brewing and distilling will operate year-round.

Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

The Market area will feature local farm products and is not conditioned.

Entire building will be fully sprinklered.

Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

Public water and sewer is not available at the Project Site.

Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

Architectural Drawings, including plans, elevations, sections, and schedules

Consultant Drawings, including structural, HVAC, power distribution, and plumbing

PEMB Shop Drawings

Design and Construction Schedule

Specification Excerpts, showing relevant spec sections

IBC and ADA Excerpts, showing relevant code and accessibility sections

After reviewing the documents, the architect discovers a coordination issue in the corridor.

The architect is preparing the project manual.

What section should be included?

Options:

A.

006113 Performance and Payment Bond

B.

012300 Alternates

C.

015000 Temporary Utilities

D.

019113 General Commissioning Requirements

Question 2

Refer to the exhibit.

Using metal stud framing, how many screws per stud are needed to connect the header if each screw is rated at 440 pounds for shear and 215 pounds for tension?

Options:

A.

2

B.

3

C.

4

D.

8

Question 3

Which species of wood is often used as a substitute for more costly species because of its hardness, grain pattern, and ability to take paint and stain well?

Options:

A.

Poplar

B.

Red oak

C.

Cypress

D.

Redwood

Question 4

What is the most destructive factor affecting the durability of mortar joints?

Options:

A.

Wind loading

B.

Location of control joints

C.

Efflorescence

D.

Expansion of moisture by freezing

Question 5

Which of the following best explains the function of Division 01 in the specifications?

Options:

A.

Describes specific materials and installation

B.

Details bidding and contract forms

C.

Establishes general administrative requirements

D.

Identifies drawing scales and symbols

Question 6

Refer to the exhibit.

Which of the following correctly identifies the types of failures indicated in the beam diagram?

Options:

A.

Tension, Compression

B.

Compression, Shear

C.

Shear, Compression

D.

Shear, Tension

Question 7

A wall separating a distillery and a taproom must meet which of the following requirements based on a flammable liquid presence?

Options:

A.

1-hour fire barrier

B.

2-hour fire wall

C.

1-hour smoke partition

D.

3-hour fire barrier

Question 8

A significant advantage of glass-fiber-reinforced concrete panels over architectural precast concrete panels is which one of the following?

Options:

A.

Increased strength

B.

Increased quality control

C.

Decreased weight

D.

Decreased fabrication time

Question 9

In the critical path method of scheduling for new construction, the site work portion is always on the critical path due to which of the following?

Options:

A.

Site work must be completed linearly.

B.

Site work is dependent upon short interval scheduling.

C.

Site cost is usually a high percentage of the total work.

D.

Retainage for site work is held until the end of the project.

Question 10

For which of the following reasons is sheet piling used? (Check the three that apply)

Options:

A.

A grade beam needs support.

B.

Raked shoring should be created.

C.

A pile cap needs support.

D.

An excessive slope on the sides of the excavation would be required.

E.

The soil surrounding an excavation site will not support itself during or after the digging.

F.

The excavation adjoins a property line and the adjacent property cannot be disturbed.

Question 11

Refer to the exhibit.

What set of conductors should the building fluorescent Lighting be connected to?

Options:

A.

A, B

B.

C, A, B

C.

C,N

D.

C,A,N

Question 12

Before construction documents are complete, the owner requests a review of the timeline allowed for ASIs, RFIs, RFPs, and change orders as defined in the project manual.

Which section of the project manual is relevant to this request?

Options:

A.

AIA Document A201

B.

Supplementary Conditions

C.

Section 01 26 00 Contract Modification Procedures

D.

Section 01 35 16 Alteration Project Procedures

Question 13

Refer to the exhibit.

In the curtain wall systems shown, each of the aluminum mullions is designed to allow for which of the following?

Options:

A.

Capillary action

B.

Horizontal expansion

C.

Vertical expansion

D.

Surface tension

Question 14

In which of the following locations should wood building products be pressure treated when used in a climate that promotes decay? Check the four that apply.

Options:

A.

Wood members in contact with masonry or concrete

B.

Wood members at grade, below grade, or less than 8 inches above grade

C.

Wood members used in conjunction with roofing or flashing

D.

Wood siding closer than 6 inches to exterior finish grade

E.

Wood window casing less than 24 inches above grade

F.

Wood doors in contact with thresholds

Question 15

Which of the following siding types should only be applied vertically?

Options:

A.

Plain bevel

B.

V-shiplap

C.

V-groove tongue and groove

D.

Board and batten

Question 16

What is the primary purpose of shop drawings?

Options:

A.

Define design intent

B.

Replace construction drawings

C.

Document record drawings

D.

Illustrate fabrication and installation methods

Question 17

An architect has a contract with a local school district to redesign a school reception office to ensure a more efficient interaction between office staff, students, and parents. The following instructions are given to the architect:

    The renovation scope is limited to the footprint only of the existing reception office.

    Additional staff is not proposed for the renovated area.

    The existing ceiling and associated fixtures will be protected from damage during construction.

    The construction of the renovation must occur during the 10-week summer break.

Which of the following series drawings should be included in the documents set?

Options:

A.

Plumbing

B.

Structural

C.

Mechanical

D.

Electrical

Question 18

The client requests to limit daylighting in a second-story bedroom located in the northeast corner of a new house, especially in the mornings. The architect is considering options for the windows in terms of quantity, size, type, and location, and notes that emergency escape and rescue openings must provide a minimum clear opening of 5.7 square feet.

Options:

A.

Three 2' x 2' awning windows on the east wall

B.

One 4' x 4' fixed window on the north wall

C.

Two 3' x 2' casement windows on the east wall

D.

One 3' x 5' double-hung window on the north wall

Question 19

Refer to the exhibit.

What is the horizontal member indicated by the arrow in the wall-floor assembly?

Options:

A.

Fire block

B.

Girt

C.

Lateral shear plate

D.

Ledger

Question 20

Refer to the exhibit.

What is the purpose of the flexible connection in the fan coil shown?

Options:

A.

To provide a field point of connection of the ductwork to the fan coil unit

B.

To insulate against heat transfer from the fan coil unit

C.

To minimize sound transfer

D.

To transition from the fan coil unit flange to the desired duct size

Question 21

Which of the following is an advantage of using a glycol-cooled air conditioning unit for a computer room?

Options:

A.

It allows for a greater distance from the computer room to the outside unit.

B.

Glycol is cheaper than water for cooling.

C.

It reduces the amount of heat exhausted from the computer room.

D.

Glycol units are a sustainable cooling solution.

Question 22

The building permit plan review for a small, two-story residential project with a crawlspace issues the following comment to the architect:

"No under floor access shown in plans. Please locate and note locations of under floor access."

Site conditions will not allow access to the crawlspace from the exterior.

What drawing will the architect need to update to satisfy the reviewer's comment?

Options:

A.

Second Floor Framing Plan

B.

Main Floor Framing Plan

C.

Foundation Plan

Question 23

In a brick veneer wall, what is the primary purpose of the 2-inch air space between the back of the brick and the sheathing?

Options:

A.

To meet the minimum R-value

B.

Allow for differential movement

C.

Provide space for roof drain piping

D.

Minimize mortar bridging

Question 24

Which code dictates the number of required exits for a 300-person assembly space?

Options:

A.

International Mechanical Code

B.

ADA

C.

International Building Code

D.

NFPA 70

Question 25

An architect is coordinating the mechanical and structural systems in a building with exposed ceilings. The HVAC ducts are interfering with a large concrete beam in the open office area.

Options:

A.

Relocate the beam to accommodate the ductwork

B.

Shift the HVAC ducts below the beam

C.

Request the mechanical engineer to reroute the ductwork

D.

Increase the ceiling height

Question 26

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

The owner requests that the metal panel skin be changed to EIFS.

Which of the following architectural sheets require changes to the notes and/or details? Check the three that apply.

Options:

A.

A-00

B.

A-02

C.

A-03

D.

A-04

E.

A-06

F.

A-07

Question 27

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

The owner is concerned about elevated noise levels in the Tap Room when fully occupied. The current design utilizes a 2 x 2 acoustic ceiling tile system installed above the fans. An acoustical engineer recommends noise mitigation through limiting reverberation time (RT) to 2.0 seconds or less in the space. This can be achieved by the provided ceiling material options and their corresponding area.

What should the architect recommend that will minimize additional project costs while providing the recommended acoustical solution?

Options:

A.

Retain current ceiling cloud layout and a 2 x 2 acoustic ceiling tile system but remove the fans.

B.

Revise design using only one ceiling cloud and cementitious wood fiber panel system (1" in thickness).

C.

Revise design using only one ceiling cloud and cementitious wood fiber panel system (2" in thickness).

D.

Retain current ceiling cloud layout and a 2 x 2 acoustic ceiling tile system and add acoustical sound board above.

Question 28

In the design of a barrier-free access route, door locksets should be equipped with which one of the following?

Options:

A.

Grip handles with thumbpieces

B.

Knurled knobs

C.

Lever handles

D.

Panic devices

Question 29

Refer to the exhibit.

Which device allows for piping misalignment and isolation?

Options:

A.

A

B.

B

C.

C

D.

D

Question 30

Which of the following have natural resins that resist termite attack? (Check the two that apply)

Options:

A.

Douglas fir

B.

Red cedar

C.

Cypress

D.

Hemlock

E.

Southern yellow pine

F.

Oak