A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.
Key project information includes:
Brewing and distilling will operate year-round.
Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.
Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.
Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.
Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.
The Market area will feature local farm products and is not conditioned.
Entire building will be fully sprinklered.
Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.
Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.
Public water and sewer is not available at the Project Site.
Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.
The following resources are available for your reference:
Architectural Drawings, including plans, elevations, sections, and schedules
Consultant Drawings, including structural, HVAC, power distribution, and plumbing
PEMB Shop Drawings
Design and Construction Schedule
Specification Excerpts, showing relevant spec sections
IBC and ADA Excerpts, showing relevant code and accessibility sections
After reviewing the documents, the architect discovers a coordination issue in the corridor.
The architect is preparing the project manual.
What section should be included?
Refer to the exhibit.
Using metal stud framing, how many screws per stud are needed to connect the header if each screw is rated at 440 pounds for shear and 215 pounds for tension?
Which species of wood is often used as a substitute for more costly species because of its hardness, grain pattern, and ability to take paint and stain well?
What is the most destructive factor affecting the durability of mortar joints?
Which of the following best explains the function of Division 01 in the specifications?
Refer to the exhibit.
Which of the following correctly identifies the types of failures indicated in the beam diagram?
A wall separating a distillery and a taproom must meet which of the following requirements based on a flammable liquid presence?
A significant advantage of glass-fiber-reinforced concrete panels over architectural precast concrete panels is which one of the following?
In the critical path method of scheduling for new construction, the site work portion is always on the critical path due to which of the following?
For which of the following reasons is sheet piling used? (Check the three that apply)
Refer to the exhibit.
What set of conductors should the building fluorescent Lighting be connected to?
Before construction documents are complete, the owner requests a review of the timeline allowed for ASIs, RFIs, RFPs, and change orders as defined in the project manual.
Which section of the project manual is relevant to this request?
Refer to the exhibit.
In the curtain wall systems shown, each of the aluminum mullions is designed to allow for which of the following?
In which of the following locations should wood building products be pressure treated when used in a climate that promotes decay? Check the four that apply.
Which of the following siding types should only be applied vertically?
What is the primary purpose of shop drawings?
An architect has a contract with a local school district to redesign a school reception office to ensure a more efficient interaction between office staff, students, and parents. The following instructions are given to the architect:
The renovation scope is limited to the footprint only of the existing reception office.
Additional staff is not proposed for the renovated area.
The existing ceiling and associated fixtures will be protected from damage during construction.
The construction of the renovation must occur during the 10-week summer break.
Which of the following series drawings should be included in the documents set?
The client requests to limit daylighting in a second-story bedroom located in the northeast corner of a new house, especially in the mornings. The architect is considering options for the windows in terms of quantity, size, type, and location, and notes that emergency escape and rescue openings must provide a minimum clear opening of 5.7 square feet.
Refer to the exhibit.
What is the horizontal member indicated by the arrow in the wall-floor assembly?
Refer to the exhibit.
What is the purpose of the flexible connection in the fan coil shown?
Which of the following is an advantage of using a glycol-cooled air conditioning unit for a computer room?
The building permit plan review for a small, two-story residential project with a crawlspace issues the following comment to the architect:
"No under floor access shown in plans. Please locate and note locations of under floor access."
Site conditions will not allow access to the crawlspace from the exterior.
What drawing will the architect need to update to satisfy the reviewer's comment?
In a brick veneer wall, what is the primary purpose of the 2-inch air space between the back of the brick and the sheathing?
Which code dictates the number of required exits for a 300-person assembly space?
An architect is coordinating the mechanical and structural systems in a building with exposed ceilings. The HVAC ducts are interfering with a large concrete beam in the open office area.
A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.
Key project information includes:
Brewing and distilling will operate year-round.
Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.
Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.
Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.
Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.
The Market area will feature local farm products and is not conditioned.
Entire building will be fully sprinklered.
Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.
Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.
Public water and sewer is not available at the Project Site.
Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.
The following resources are available for your reference:
Architectural Drawings, including plans, elevations, sections, and schedules
Consultant Drawings, including structural, HVAC, power distribution, and plumbing
PEMB Shop Drawings
Design and Construction Schedule
Specification Excerpts, showing relevant spec sections
IBC and ADA Excerpts, showing relevant code and accessibility sections
After reviewing the documents, the architect discovers a coordination issue in the corridor.
The owner requests that the metal panel skin be changed to EIFS.
Which of the following architectural sheets require changes to the notes and/or details? Check the three that apply.
A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.
Key project information includes:
Brewing and distilling will operate year-round.
Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.
Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.
Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.
Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.
The Market area will feature local farm products and is not conditioned.
Entire building will be fully sprinklered.
Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.
Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.
Public water and sewer is not available at the Project Site.
Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.
The following resources are available for your reference:
Architectural Drawings, including plans, elevations, sections, and schedules
Consultant Drawings, including structural, HVAC, power distribution, and plumbing
PEMB Shop Drawings
Design and Construction Schedule
Specification Excerpts, showing relevant spec sections
IBC and ADA Excerpts, showing relevant code and accessibility sections
After reviewing the documents, the architect discovers a coordination issue in the corridor.
The owner is concerned about elevated noise levels in the Tap Room when fully occupied. The current design utilizes a 2 x 2 acoustic ceiling tile system installed above the fans. An acoustical engineer recommends noise mitigation through limiting reverberation time (RT) to 2.0 seconds or less in the space. This can be achieved by the provided ceiling material options and their corresponding area.
What should the architect recommend that will minimize additional project costs while providing the recommended acoustical solution?
In the design of a barrier-free access route, door locksets should be equipped with which one of the following?
Refer to the exhibit.
Which device allows for piping misalignment and isolation?
Which of the following have natural resins that resist termite attack? (Check the two that apply)