A Production Supervisor queries a work order, WO-1025, from the Manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, the supervisor finds a General Information, Operations, and History tab, but no Reservations tab.
What are two reasons for the Reservations tab not being displayed for WO-1025?
Production operations need operators to execute the right steps to produce quality products, so want to use "View Document Items on a Dispatch List."
Which statement is NOT true?
Your client needs to implement operational checks for compliance with training and job requirements. Which four statements are true about this functionality?
Which three can you set as Overcompletion Tolerance Type and its value for a subcomponent yield, so that the job order can report the excess production completion?
A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2 available for day and night shift.
What is the correct sequence of steps to achieve this?
A Production Operator is executing a work order at your plant. After completing move transactions, they notice that they have performed some incorrect move operations, including incorrect scrap and reject transactions.
They must perform a reverse transaction to correct the errors. The operations are not count point-enabled and not auto-charged.
Which four transactions are required to correct this situation?
A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particularday.
Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?
Which three statements are true about the main areas of Managerial Accounting?
In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?
A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?
To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.
Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?
Which statement is NOT true about user-defined work order statuses?
In which two places can you create and edit user-defined work order statuses?
In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?
Your client's company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.
You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.
Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?