Question 1

Through Which Order does the OEM outsource the manufacturing of products to the contract manufacturer?

Options:

A.

Transfer Order

B.

Work Order

C.

Purchase Order

D.

Sales Order

Question 2

Which task is used to upload an external forecast in the system?

Options:

A.

Refresh and start the Order Promising Server

B.

Load planning data from files

C.

Load filter names for planning data collections

D.

Export supply chain planning data

Question 3

While defining Supply Plan, Planning administrator can select any of the four forecast process options, which include?

Options:

A.

Past Due Demands based on Supply Network Model

B.

Forecast Spreading

C.

Forecast Consumption

D.

Sales Order Explosion

E.

Past Due Demands based on Plan Option Values

Question 4

Which three are present in the Plan Parameter section?

Options:

A.

Forecast Buckets

B.

Planning Calendar

C.

Price list

D.

Level Member

E.

Output Measure

F.

Exception set

Question 5

What are the two Job Roles required to define the Manufacturing Master Data?

Options:

A.

Manufacturing Engineer?

B.

Production Operator

C.

Production Supervisor

D.

Cost Accountant

Question 6

Which two parameters determine the release of planned orders in Demand Forecast to Supply Plan Process?

Options:

A.

Sourcing Rules

B.

Demand Schedule

C.

Item Attributes

D.

Sales Orders

E.

External Forecast

Question 7

Which Job Role is required to issue components to a work order?

Options:

A.

Cost Accountant

B.

Production Supervisor

C.

Manufacturing Engineer

D.

Production Operator

Question 8

Which three are Plant parameters?

Options:

A.

Material Parameters

B.

Manufacturing Calendar

C.

Work Areas

D.

Work Orders

Question 9

What is the input required to reserve the components against a work order?

Options:

A.

Routing Information of the Finished Product

B.

Manufacturing Master Data

C.

Item Structure of the Finished Product

D.

Plant Parameters

Question 10

Which two types of analysis can you use to compare forecast accuracy of a plan in a given time period?

Options:

A.

MAD

B.

Waterfall analysis

C.

Trend analysis D BIAS

D.

MAPE

Question 11

Which three tasks can production operators perform from the Dispatch List?

Options:

A.

Report Resource Transactions

B.

Issue Materials

C.

Print Work order traveler and product labels

D.

Report Material Transactions

Question 12

What is the purpose of defining the ABC Classification?

Options:

A.

To decide the frequency to perform inventory replenishment

B.

To decide the frequency to review inventory balances

C.

To decide the frequency to perform inventory transactions

D.

To decide the frequency to perform inventory accuracy review

Question 13

Which three are key operational tasks associated with Material Reservation?

Options:

A.

Manage Production

B.

Item Creation

C.

Execute Production

D.

Manage Inventory Transactions

Question 14

With which two supply types are non-tracking components automatically transacted? a work order?

Options:

A.

Operation Pull

B.

Supplier

C.

Push

D.

Assembly Pull

Question 15

Which of the three statements are true While planning, the administrator defining the supply plan has the option to setup items included in the supply chain.

Options:

A.

Manufacturing Plan to include both items that are MPS and MRP Planned items

B.

Production Plan to include items that are MPS Planned items

C.

Production Plan to include both items that are MPS and MRP Planned items

D.

Manufacturing Plan to include items that are MRP Planned items