Oracle 1z0-244 Oracle EBS R12: Advanced Supply Chain Planning Exam Practice Test

Demo: 13 questions
Total 89 questions

Oracle EBS R12: Advanced Supply Chain Planning Questions and Answers

Question 1

This demand source type is used to suggest time-phased safety stock levels for your bill of material Items In all your supply chain organizations.

Some of Its features are that It allows you to specify:

1. service levels by customer, channel, and product

2. variability: demand and supplier lead time

3. objectives and penalty costs for your enterprise

Identify this demand source type that is used in Advanced Supply Chain Planning.

Options:

A.

Safety Stock: Inventory Optimization

B.

Safety Stock: Planning

C.

Safety Stock: Inventory

D.

Independent Demand

E.

Dependent Demand

Question 2

You are Integrating Oracle Distribution Planning with other Oracle Advanced Planning Suite products.

To which Oracle Advanced Planning Suite product does Distribution Planning provide a statement of product availability?

Options:

A.

Oracle Demand Planning

B.

Oracle Production Scheduling

C.

Oracle Global Order Promising

D.

Oracle Inventory Optimization

E.

Oracle Advanced Supply Chain Planning

F.

Oracle Collaborative Planning

Question 3

Identify the statement that Is NOT correct.

Options:

A.

Oracle Warehouse Management uses Resource Warehouses to store Machine resources/Capital equipment needed in the Shop floor.

B.

Oracle ASCP recognizes Resource Warehouses as production facilities that require capacity planning.

C.

To use the capacity planning function of ASCP, each OPM production plant must own one resource warehouse.

D.

Complex routings are part of Oracle Process Manufacturing (OPM).

Question 4

Your client Is set up to run a Constrained plan ABC. This plan Is set up with the Enforce Demand Due Dates option.

The plan ABC Is run successfully and the outcome of the plan is ready.

Which three options can be expected as recommendations out of the plan ABC run?

Options:

A.

A purchase requisition Is scheduled within the lead-time set for the Item.

B.

A Job is scheduled to use two resource units when there is only one resource unit available.

C.

One of the demands is going to be fulfilled late.

D.

Planning time fence is respected.

E.

One machine resource Is overloaded.

Question 5

Which three statements are correct about Sourcing Rules and Bills of Distribution (BOD)?

Options:

A.

Only Sourcing Rule has effectivity dates and not BOD.

B.

If there is a conflict between a BOD and Sourcing Rule, BOD takes precedence.

C.

Sourcing Rules and BOD cannot be assigned together in the same assignment set.

D.

Sourcing Rules define inventory replenishment methods for only one organization.

E.

If there is a conflict between a Sourcing Rule and a BOD, the Sourcing Rule takes precedence.

F.

In a BOD, time-phasing applies to both shipping and receiving organizations.

G.

In a Sourcing Rule, time-phasing applies only to the shipping organizations. The receiving organization remains static for the life of the Sourcing Rule.

Question 6

You learn that the planner at your client needs to make decisions on how many shifts to run on the weekend on a weekly basis. The process he or she Is currently using makes estimated capacity changes on the source system. Next, he or she runs a net change data collection, and then runs a constrained plan and reviews the results.

The planner is confident that changing the capacity and running the plan allows him or her to make a more informed decision regarding the weekend shifts; however, the process of making changes on the source system and running data collections is time consuming.

What should be your recommendation to improve this process?

Options:

A.

Use the Targeted Refresh Data collection method to collect the proposed shift changes. Then run the Plan to provide details to make weekend shift decisions.

B.

Use a Resource Group to identify the bottleneck resources. Change Plan options to calculate resource requirements for bottleneck resources. This will reduce the number of resources in the plan to analyze.

C.

Change the Plan Options to Constrained - Enforce Due Dates. Use this plan to make weekend shift decisions.

D.

Copy the Baseline Plan to a Simulation Plan. Make capacity changes by adding shifts using a simulation set directly In the Simulation Plan. Perform net change simulation to provide the details to make weekend shift decisions.

E.

Set up Organization specific Collection Groups for Data collection to reduce the amount of data being collected from the source system. Then, run the constrained plan to provide details to make weekend shift decisions.

Question 7

Identify three correct statements about phantom Items?

Options:

A.

One Bill of Material can represent a phantom subassembly for one parent Item, but It cannot be a stocked subassembly for another parent Item.

B.

The full cost rollup process sets the pending phantom assembly burden to 1.

C.

A phantom subassembly is a nonstocked subassembly that enables you to group the material needed to produce an assembly.

D.

Oracle Work In Process explodes through a phantom subassembly to the components as If the components were tied directly to the parent assembly.

E.

You cannot define routing for phantom assemblies the same way as other assemblies.

F.

You can compute manufacturing and cumulative lead times for phantom assemblies that have routings.

Question 8

You are using a Material and Resource Constrained Plan. Your horizon Is the near term future.

Identify the correct question or goal for this plan.

Options:

A.

Generate a feasible plan that respects material, resource, distribution, and transportation constraints.

B.

How much resource capacity would I need to arrange to satisfy all anticipated demand in a timely manner?

C.

How much resource capacity and material availability would I need to arrange to satisfy all anticipated demand in a timely manner?

D.

Generate an optimized and executable plan based on plan objectives and material, resource, and transportation constraints.

E.

How much material availability would I need to arrange to satisfy all anticipated demand in a timely manner?

Question 9

The following list contains possible places the Planning engine will check for Penalty Factors for Late Demand In an Optimized Plan:

1. At the Plan Option Level

2. Flexfield at the Item Level

3. At the System Profile Level

4. Flexfield at the Demand Level

5. Flexfield at the Organization Level

Identify the correct sequence.

Options:

A.

3, 1, 5, 2, 4

B.

2, 5, 4, 1, 3

C.

4, 2, 5, 1, 3

D.

2, 4, 5, 3, 1

E.

4, 5, 2, 3, 1

F.

1, 2, 3, 4, 5

Question 10

Identify two statements that are true for Forecast Consumption.

Options:

A.

Current Forecast equals Original Forecast plus Customer Orders.

B.

Forecast Consumption Is the process of Increasing a Forecast quantity by the quantity of a Sales Order that the Forecast expects.

C.

Forecast Consumption Is the process of decreasing a Forecast quantity by the quantity of a Sales Order that the Forecast expects.

D.

Current Forecast equals Original Forecast less Customer Orders.

Question 11

Identify the three steps that a planner can perform during Net change Simul-ation On-line planning.

Options:

A.

Add Supplier capacity.

B.

Change BOM Supply Type for a component from Phantom to Supplier.

C.

Firm Discrete Jobs.

D.

Add new Resource availability by adding shifts.

E.

Change Item attribute order modifiers.

F.

Change Resource Basis from Item to Lot.

Question 12

You define a Supply Chain Plan of type "Master Plan."

In the main tabbed region of Plan Options, you select Planned Items as "All Planned Items" and select the Include Critical Components check box.

Which three describe the Items In the planned organizations that are selected by the plan?

Options:

A.

all Items with the Planning Method Item Attribute of "MPS Planning" or "MPS/MPP Planned"

B.

all critical Items and any assembly that has a critical component anywhere in its Supply Chain Bill. All sandwiched Items are also selected.

C.

all Items EXCEPT the ones with the Planning Method Item Attribute set to "Not Planned"

D.

Any Item that has a component with the Planning Method Item Attribute of "MRP/MPP Planned," "MPS/MPP Planned," or "MPP Planned" anywhere in its Supply Chain Bill. All sandwiched Items are also selected.

E.

all Items with the Planning Method Item Attribute of "MRP/MPP Planned," "MPS/MPP Planned," or "MPP Planned"

Question 13

For Buy or Transfer orders, the Dock Date for Scheduled Receipts Is calculated as the

Options:

A.

end of Postprocessing Lead Time

B.

end of Processing Lead Time or beginning of Postprocessing Lead Time

C.

beginning of Preprocessing Lead Time

D.

end of Preprocessing Lead Time or beginning of Processing Lead Time