Question 1

In order to earn LEED certification, a project must

Options:

A.

employ a LEED AP on its project team

B.

conduct a whole-building life-cycle assessment

C.

earn a minimum 0t 50 points or meet a prerequisite

D.

satisfy all prerequisites and earn a minimum number of points

Question 2

Rainwater Management is a credit in which LEED v4 category?

Options:

A.

Water Efficiency

B.

Sustainable Sites

C.

Energy and Atmosphere

D.

Location and Transportation

Question 3

The maximum points a new construction platinum LEED for Neighborhood Development certification level can earn are

Options:

A.

8

B.

10

C.

12

D.

16

Question 4

Which impact category is weighted the most in the LEED rating systems?

Options:

A.

Biodiversity

B.

Human Health

C.

Climate Change

D.

Water Resources

Question 5

Which strategy can reduce potable water consumption?

Options:

A.

Install submeters

B.

Increase site imperviousness

C.

Harvest rainwater for reuse

D.

Use a solar hot water heater

Question 6

The project team is conducting a feasibility study of a building project. The developer has pre-qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?

Options:

A.

A brownfield site with no access to metro

B.

A brownfield site in a national park with car access only

C.

A greenfield site with access to public transport and proximity to grocery stores

D.

A brownfield site with access to five lines of public transportation and basic services

Question 7

Which type of site Is appropriate for development of LEED projects?

Options:

A.

Floodplain

B.

Greenfield

C.

Brownfield

D.

Undeveloped

Question 8

The LEED credit weightings. in regard to the most important environmental impacts and human benefits, are based on impact categories defined and established by the

Options:

A.

U.S. Green Building Council (USGBC)

B.

U.S. Federal Government and Department of Energy (DOE)

C.

Sheet Metal-and Air Conditioning Contractors National Association (SMACNA)

D.

American Society Of Heating, Refrigeration and Air-conditioning Engineers (ASHRAE)

Question 9

Which location for a new building will have the greatest impact on lowering greenhouse gas emissions?

Options:

A.

An economic development district

B.

A brownfield location

C.

A previously developed site

D.

An urban center instead of the suburbs

Question 10

What does the U.S. Green Building Council (USGBC) administer?

Options:

A.

LEED Green Associate exams

B.

LEED rating systems development

C.

LEED Credentialing programs related to Green Building practice

D.

LEED Project Certification through third-party certification bodies accredited by the American National Standards Institute (ANSI)

Question 11

According to the LEED Minimum Program Requirements (MPR) specifying minimum occupancy rates, a project must serve how many occupants?

Options:

A.

One or more Full Time Equivalents (FTEs)

B.

Five FTEs for six months

C.

50% of occupancy based on code

D.

At least two FTEs, no later than SIX months after Commissioning (Cx)

Question 12

The intent of waste management in the Materials and Resources credit category is to

Options:

A.

specify the use of green materials

B.

promote the use of rapidly renewable resources

C.

reduce the amount of waste and toxins hauled to landfills

D.

increase the use of pre-consumer/post-consumer recycled content

Question 13

Which of the following is an appropriate way to use non-potable water in a building?

Options:

A.

Using captured stormwater for showering

B.

Using wastewater from a sink for dishwashing

C.

Flushing a toilet with wastewater from bathroom sinks

D.

Incorporating air conditioner process water for washing clothes

Question 14

Integrated Project Planning and Design is a prerequisite for which type of buildings?

Options:

A.

Retail

B.

Schools

C.

Healthcare

D.

Data Centers

Question 15

Installing permanent water submeters that measure the total potable water use for a building and associated grounds has which of the following benefits?

Options:

A.

Informs the selection of locally adapted plants

B.

Allows facility staff to track water consumption and identify leaks

C.

Increases on-site water retention and infiltration of rainfall into the ground

D.

Reduces the amount of water needed to support industrial and process systems

Question 16

As of 1996, the Montreal Protocol banned the production of what chemical compound known to have ozone-depleting potential?

Options:

A.

Chlorofluorocarbons (CFCs]

B.

Hvdrofluorocarbons (HFCs)

C.

Hvdrofluorocarbons Phaseout Management Plan (HPMP)

D.

Hvdrochlorofluorocarbons (HCFCs)

Question 17

For benchmarking purposes, a baseline building performance is evaluated (by means of energy simul-ation model), as defined in

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 52.2-2007

C.

ASHRAE 62 1-2010

D.

ASHRAE 90.1-2010. Appendix G

Question 18

Which label or certification indicates reduced water consumption for appliances?

Options:

A.

ASHRAE 90.1

B.

GREENGUARD

C.

ISO 14001:2015

D.

ENERGY STAR

Question 19

The cradle-to-cradle approach to sustainable materials evaluates

Options:

A.

building materials from extraction to reuse

B.

building materials from extraction to disposal

C.

building materials from installation to disposal

D.

building materials from installation to recycling

Question 20

In order to maintain the LEED Green Associate credential, you must earn which of the following continuing education credits?

Options:

A.

15 hours per year with six hours being LEED specific

B.

15 hours every two years with three hours being LEED specific

C.

30 hours per year with three hours being LEED specific

D.

30 hours every two years with six hours being LEED specific

Question 21

According to systems thinking, climate change is an example of which of the following feedback loops?

Options:

A.

Stable

B.

Isolated

C.

Positive

D.

Balancing

Question 22

A nine-story residential building includes 60% of the gross floor area within the project scope, Which rating system is the most appropriate for the LEED certification of this project?

Options:

A.

LEED AP Building Design and Construction: Multifamily Midrise

B.

LEED AP Building Design and Construction: Core and Shell Development

C.

LEED AP Building Design and Construction. Homes and Multifamily Low-rise

D.

LEED AP Building Design and Construction: New Construction and Major Renovation

Question 23

An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?

Options:

A.

LEED AP

B.

Leasing Agent

C.

Facilities Manager

D.

Commissioning (Cx) Agent

Question 24

Which of the following processes should a project team use to establish synergy among systems and components?

Options:

A.

Comprehensive

B.

Interactive

C.

Integrative

D.

Systematic

Question 25

Sustainable forestry is the practice of maintaining forest resources to meet the long-term forest product needs of humans while maintaining the

Options:

A.

cost of the forest products

B.

quality Of salvaged wood products

C.

harvesting of the rapidly grown forest

D.

biodiversity of the forest and landscape

Question 26

In the commercial LEED rating systems, which point range will achieve the Silver level of certification?

Options:

A.

30-39 points

B.

40-49 points

C.

50-59 points

D.

60-69 points

Question 27

Which of the following principles is a part of the integrated process?

Options:

A.

Cradle-to-cradle

B.

Systems thinking

C.

Project scheduling

D.

Building information modeling

Question 28

A project has 16 employees working for four hours per day, 20 employees working six hours per day, and 10 employees working eight hours per day. What is the Full Time Equivalent (FTE) occupancy of the project?

Options:

A.

28

B.

33

C.

33

D.

46

Question 29

Which of the following is a strategy for preventing light pollution?

Options:

A.

Install up-lighting

B.

Install shielded fixtures

C.

Install high performance windows

D.

Use dark paving materials to diminish light distribution

Question 30

What is the minimum gross floor area required for a Building Design and Construction (BD+C) project to be eligible for certification?

Options:

A.

250 ft2 (23 m2)

B.

500 ft2 (46 m2)

C.

750 ft2 (70 m2)

D.

1000 tt2 (93 m2)

Question 31

Which of the following represents a unit of carbon dioxide equivalent that is reduced, avoided, or sequestered to compensate for emissions occurring elsewhere?

Options:

A.

Calculator

B.

Carbon offsets

C.

Demand response

D.

Renewable energy

Question 32

Which of the following power sources are considered green power?

Options:

A.

Natural gas

B.

Biomass

C.

Nu clear

D.

Clean coal

Question 33

Which of the following scenarios would potentially help a project earn the most LEED points?

Options:

A.

Renovate an abandoned shopping mall in a low-density area outside the city

B.

Build an office and apartment building near an interstate highway and an existing shopping mall

C.

Renovate a large building in a diverse, walkable business district and central transit connectivity

D.

Build a low-density project on a greenfield site outside the city in order to mitigate environmental impact

Question 34

Which LEED strategy creates a smaller footprint and maximizes the floor area ratio?

Options:

A.

Increase density

B.

Increase population

C.

Increase surrounding diversity

D.

Increase hardscape around building

Question 35

Lighting controls are typically installed in buildings in order to:

Options:

A.

Prevent building managers from making changes to the light levels

B.

Improve occupant comfort and save energy throughout the building

C.

Filter glare produced by overhead fixtures and prevent ultraviolet radiation from reaching building occupants

D.

Provide a uniform light level across every space in a building

Question 36

How is an exemplary performance point earned if the credit is available for exemplary performance per the Reference Guide?

Options:

A.

Submit a Project CIR

B.

Increase performance by 25%

C.

Verify that precedent has been established

D.

Meet the indicated incremental performance threshold

Question 37

Which of the following is a minimum program requirement for the LEED for New Construction and Major Renovations Rating System?

Options:

A.

Comply with minimum project size

B.

Include temporary structures in floor area calculations

C.

Define a site boundary for the sole purpose of complying with credits

D.

Comply with the best practices of the International Organization for Standardization (ISO)

Question 38

To reduce the use of potable water for irrigation, which of the following factors should be taken into consideration?

Options:

A.

Minimize pervious areas

B.

Minimize green roof area

C.

Maximize use of native species

D.

Maximize use of pervious pavement

Question 39

Which of the following project characteristics demonstrate smart growth principles?

Options:

A.

The project is built on a former chemical landfill site

B.

The project consists of a sprawling new housing complex 5 mi. (8 km) from the nearest city

C.

The project consists of two adult care facilities, three senior center facilities and one nursing home

D.

The project protects open space and farmland by building housing and offering transportation choices near jobs, shops and schools

Question 40

Which LEED adaptation includes the ability to reduce point thresholds for LEED certification levels based on building size?

Options:

A.

LEED Interior Design and Construction: Retail

B.

LEED Neighborhood Development: Built Project

C.

LEED Building Design and Construction: Homes

D.

LEED Building Design and Construction: Schools

Question 41

ASHRAE standards are applicable to which of the following LEED categories?

Options:

A.

Sustainable Sites and Energy and Atmosphere

B.

Materials and Resources and Sustainable Sites

C.

Water Efficiency and Indoor Environmental Quality

D.

Energy and Atmosphere and Indoor Environmental Quality

Question 42

In which LEED rating category does a Built Project fall into?

Options:

A.

LEED for Building Design and Construction

B.

LEED for Interior Design and Construction

C.

LEED for Operations and Maintenance

D.

LEED for Neighborhood Development

Question 43

Solar Reflectance Index (SRI) combines reflectivity with:

Options:

A.

Transmissivity

B.

Emissivity

C.

Absorptivity

D.

Conductivity

Question 44

Which of the following statements regarding non-potable water is true?

Options:

A.

Blackwater can only be used for flush fixtures

B.

Stormwater runoff can be treated and used in a facility's cooling towers

C.

Captured rainwater must be treated before it can be used to irrigate landscaping

D.

can be used for any household purpose as long as it is not consumed

Question 45

The maximum number of credits that can be achieved under Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is

Options:

A.

30

B.

31

C.

33

D.

35

Question 46

Which of the following is a source of graywater?

Options:

A.

Toilets

B.

Urinals

C.

Sprinklers

D.

Lavatory faucets

Question 47

The design charrette team is pursuing LEED certification for a large commercial building with ample landscape area using native species and considering applicable credits. What combination of credits represents this synergy?

Options:

A.

Site Assessment and Outdoor Water Use Reduction

B.

Demand Response and Indoor Air Quality Assessment

C.

Heat Island Reduction and Thermal Comfort

D.

Advanced Energy Metering and Construction Indoor Air Quality Management Plan

Question 48

Approximately what percentage of the Earth’s water is fresh water?

Options:

A.

4%

B.

1%

C.

2%

D.

3%

Question 49

Which is an example of regenerative design?

Options:

A.

Passive house energy building

B.

A building with a recycling program

C.

A project that uses sustainable materials

D.

A building that generates electricity and sends the excess to the grid

Question 50

What is the scope of the LEED impact category component Protect Human Health from Direct Exposure to Negative Health Impacts?

Options:

A.

Building occupants during use and demolition phase of the building cycle, within the project boundary

B.

Occupants and construction crew during construction or renovation phase of the building cycle, within the project boundary

C.

Design and construction crew during the construction phase, within the project boundary and excluding its immediate surroundings

D.

Building occupants and design and construction crew during the construction phase and use phase ol the building cycle, within the project boundary and its immediate surroundings

Question 51

Which type of water should be considered an alternative water source?

Options:

A.

Rainwater

B.

Dirty water

C.

Blackwater

D.

Potable water

Question 52

At which stage should the coordination of building and site systems be addressed to maximize the impact of integrative process?

Options:

A.

Predesign

B.

Detailed Design

C.

Post Occupancy

D.

Schematic Design

Question 53

Which of the following strategies contributes to reducing heat island effect and managing rainwater runoff?

Options:

A.

A vegetated roof

B.

White cement roof pavers

C.

A rainwater collection system

D.

Shading structures that include photovoltaic panels

Question 54

Which of the following project types and scopes are addressed by LEED rating systems?

Options:

A.

LEED Operations & Maintenance: Schools

B.

LEED Interior Design and Construction: Data Centers

C.

LEED Building Design and Construction: Existing Buildings

D.

LEED Neighborhood Development: Warehouses and Distribution

Question 55

ASHRAE 189.1 is an alternative compliance path to what building code?

Options:

A.

American National Standards Institute (ANSI)

B.

International Green Construction Code (IGCC)

C.

ASHRAE 90.1

D.

California's Title 24

Question 56

The purpose of a life-cycle assessment in LEED is to evaluate the potential

Options:

A.

cost impacts Of a building through its life-cycle

B.

safety impacts of a material through its life-cycle

C.

human impacts 0t a material through its lite-cycle

D.

environmental impacts of a building through its life-cycle

Question 57

Which component directly reduces a building's Greenhouse Gas (GHG) emissions?

Options:

A.

High-efficiency HVAC

B.

Double-glazed windows

C.

Building Commissioning (Cx)

D.

Native plant landscaping

Question 58

A project plans to build a campus of buildings. Which of the following strategies should the project team consider to reduce energy demand?

Options:

A.

Purchase carbon offsets

B.

Design buildings to shade each other

C.

Enroll in a demand response program

D.

Select HVAC equipment without refrigerants

Question 59

Careful selection of which of the following substances helps manage ozone depletion potential and global warming potential?

Options:

A.

Refrigerants

B.

Insulation

C.

Fuels

D.

Sealants

Question 60

An architect found a source for reclaimed wood doors from a recently demolished building 600 mi. (966 km) away from the project site. Towards which of the following sustainable criteria can the doors be used?

Options:

A.

Certified Wood

B.

Materials Reuse

C.

Recycled Content

D.

Local Materials

Question 61

One of the requirements for the Sustainable Sites Credit. Rainwater Management is that projects must

Options:

A.

maximize open space within the LEED project Boundary

B.

calculate the total rainwater runoff for 75th percentile rainfall events

C.

use Green Infrastructure and Low Impact Development techniques within the LEED project boundary

D.

use a combination of both structural and non-structural measures to manage a 90th percentile rainfall event

Question 62

The Solar Reflective Index (SRI) applies to which concept?

Options:

A.

Reducing light pollution

B.

Reducing heat island effect

C.

Avoidance of sensitive habitat

D.

Maximizing access to open space

Question 63

Which of the following benefits pertain to purchasing and installing locally sourced. environmentally preferable products?

Options:

A.

Products contain recycled content

B.

Products are long lasting and durable

C.

The environmental harm associated with transportation is reduced

D.

Factories that support human health and workers' rights are used

Question 64

Which of the following sites is most appropriate to encourage a walkable street design?

Options:

A.

A neighborhood that includes a diversity of use

B.

An area with a decreased building-height-to-street-width ratio

C.

A development that uses many culs-de-sac in the street design

D.

A project in an area designed with streets to facilitate increased speed limits

Question 65

Which of the following strategies is considered an approach to land management that mimics natural systems and manages rainwater as close to the source as possible?

Options:

A.

Xeriscaping

B.

Passive Design

C.

Evapotranspiration

D.

Low-Impact Development

Question 66

Which strategy will help build consensus for a project's sustainability goals?

Options:

A.

Hosting a charrette

B.

Survey building occupants

C.

Circulating a project scorecard

D.

Including LEED language in project specifications

Question 67

Which of the following water types is suitable for drinking?

Options:

A.

Graywater

B.

Greenwater

C.

Stormwater

D.

Potable water

Question 68

Which is an example of a low-cost Water Efficiency strategy?

Options:

A.

Install new flush valves or flow restrictors

B.

Install subsurface cisterns to collect stormwater

C.

Use only compostable toilets throughout the facility

D.

Incorporate an on-site blackwater treatment system

Question 69

Which of the following terms encourages team members to collaborate throughout the process of design and construction to create synergistic solutions?

Options:

A.

Charrette

B.

Triple bottom line

C.

Life-cycle analysis

D.

Integrative design

Question 70

Select the type of approach that promotes the conservation of Materials and Resources by linking elements in order to form relationships with their function

Options:

A.

Open Flow

B.

Closed Flow

C.

Open Systems

D.

Closed Systems

Question 71

LEED stands for

Options:

A.

Leadership in Eco and Energy Design

B.

Leadership in Efficiency and Energy Design

C.

Leadership in Energy and Environmental Design

D.

Leadership in Environmental and Efficiency Design

Question 72

Which class of refrigerants contributes the most to ozone depletion potential (ODP)?

Options:

A.

Ammonia (NH3)

B.

Hydrofluorocarbons (HFCs)

C.

Chlorofluorocarbons (CFCs)

D.

Hydrochlorofluorocarbons {HCFCs}

Question 73

When considering water conservation and water efficient landscaping, which type of water would be most useful for landscape irrigation?

Options:

A.

Rainwater

B.

Blackwater

C.

Clean water

D.

potable water

Question 74

Which of the following strategies can be used for improving Indoor Environmental Quality during construction?

Options:

A.

Monitor outdoor airflow

B.

Calibrate sensors

C.

Maintain clean interior spaces

D.

Use integrated pest management

Question 75

Which strategy can be used to reduce the amount of construction waste?

Options:

A.

Encourage recycling

B.

Specify regional materials

C.

Increase the use of recycled content

D.

Institute an off-site composting program

Question 76

The general contractor for a project located in a dense urban area attempts to gain a credit in Materials and Resources. Which of the following is considered a local material?

Options:

A.

Quarry tile that is extracted 370 mi (595 km) away and manufactured in a city 1.600 mi (2 575 km) away

B.

Stone that is harvested and processed 80 mi (128.7 km) from the project site and purchased 75 mi. (121 km) away

C.

Vinyl flooring manufactured 500 mi (805 km) away but is sold at a warehouse 2 mi (3.2 km) from the project site

D.

Bamboo flooring that is harvested 2.350 mi. (3 782 km) away and manufactured 200 mi. (322 km) away from the project site

Question 77

Which of the following projects would be appropriate to pursue LEED certification according to the Minimum Program Requirements (MPRs)?

Options:

A.

A new parking garage construction occupying a total of 15,000 ft² gross floor area

B.

A new building that will occupy 12,000 ft² gross floor area on previously developed land

C.

A historic building intended for restoration occupying 900 ft² of gross floor area

D.

A movable house attached to a trailer that can be moved from state to state

Question 78

Which of the following team members should participate in the initial evaluation to determine which level of LEED certification to target?

Options:

A.

Owner

B.

Zoning Official

C.

Project Safety Officer

D.

Green Business Certification Inc. (GBCI) Certification Reviewer

Question 79

What is the unit of measure for water closets?

Options:

A.

Gallons (Liters) per flush

B.

Gallons (Liters) per person

C.

Average usage per hour

D.

Usage per full time employee

Question 80

Designers and builders can construct a green building that uses significantly less water than a conventional building by incorporating which opportunity?

Options:

A.

Use of potable water

B.

Native plant landscapes

C.

Invasive plant landscapes

D.

Not tracking water metering

Question 81

In which of the following common building applications are chlorofluorocarbons (CFCs) found?

Options:

A.

Fire hydrants

B.

Roof-top vents

C.

Insulation agents

D.

Centrifugal chillers

Question 82

Building and material reuse contribute to the sustainability goals of a project by

Options:

A.

reducing the use Of raw materials

B.

saving time during the material selection phase

C.

lowering the overall construction budget ot the project

D.

utilizing waste-to-energy as an alternative to fossil fuel extraction

Question 83

Which of the following plans is implemented after occupancy?

Options:

A.

Green Cleaning

B.

Value Engineering

C.

Fundamental Commissioning (cx)

D.

Stormwater Pollution Prevention

Question 84

Which of the following falls under the Energy and Atmosphere credit category?

Options:

A.

Interior Lighting

B.

Heat Island Reduction

C.

Cooling Tower Water Use

D.

Enhanced Refrigerant Management

Question 85

All LEED rating systems include:

Options:

A.

110 base points plus five Innovation points and two Regional Priority points for a total of 117 points

B.

100 base points, plus six Innovation points and four Regional Priority points for a total of 110 points

C.

90 base points plus four Innovation points and six Regional Priority points for a total of 100 points

D.

110 base points plus six Innovation points and four Regional Priority points for a total of 120 points

Question 86

Which of the following negative impacts on the environment are a result of waste being transported/diverted to landfills?

Options:

A.

Increased pre-consumer recycled content

B.

Decreased post-consumer recycled content

C.

Waste is incinerated and used to generate energy

D.

Solid waste produces methane and potent greenhouse gas

Question 87

In an effort to preserve the aquatic habitat and natural stream morphology of a fresh-water stream located downstream of a project boundary, one should consider which of the following strategies?

Options:

A.

Minimize pervious surfaces, enhance native vegetation and capture and reuse rainwater

B.

Minimize impervious surfaces, enhance native vegetation and capture and reuse rainwater

C.

Minimize pervious surfaces, implement low-impact development strategies and mimic natural systems

D.

Minimize impervious surfaces, implement high-impact development strategies and mimic natural systems

Question 88

Which of the following narratives explains the relationship between prerequisites and credits for purposes of LEED certification?

Options:

A.

Not all credit categories have a prerequisite

B.

Prerequisites are mandatory and credits are optional

C.

Prerequisites are mandatory if credits are pursued in the specific category

D.

Credits are assigned the same base points and prerequisites are weighted

Question 89

According to LEED. which of the following should be considered when locating a site for a project?

Options:

A.

Political landscape

B.

Infrastructure context

C.

Economic stability

D.

Revenue generating possibilities

Question 90

What standard ensures adequate ventilation is supplied to building occupants?

Options:

A.

ASHRAE 55

B.

ASHRAE 62.1

C.

ASHRAE 90.1

D.

ASHRAE 189.1

Question 91

Which third party certification is recommended to use when specifying sustainable cleaning products?

Options:

A.

Greenguard"

B.

Green Seal'™'

C.

Green Label Plus*

D.

Design for the Environment

Question 92

An office building is located in an area without public transit access. Which of the following strategies should the office use to promote alternative transportation?

Options:

A.

Offer preferred parking for single-use vehicles

B.

Develop a carpooling program for building occupants

C.

Provide additional parking

D.

Require the local transit authority to add a new route to the site

Question 93

Which impact categories have been identified as most important for a LEED project to accomplish?

Options:

A.

Increase return on investment, promote human scale development

B.

Protect biodiversity and ecosystem services, improve business efficiency

C.

Reduce contribution to climate change, enhance human health and well-being

D.

Increase return on investment, promote sustainable and regenerative material cycles

Question 94

Which formula is used for calculation of the percentage of restoration area?

Options:

A.

Percentage of restoration area = (Disturbed area I Restoration site area) x 100

B.

Percentage of restoration area = (Restoration area / Total previously disturbed site area) x 100

C.

Percentage of restoration area = (Restoration area / Total proposed restoration site area) x 100

D.

Percentage of restoration area = (Restoration area / Total previously undisturbed site area) x 100

Question 95

In addition to the temperature and air movement, what is another factor to consider when implementing Thermal Comfort strategies?

Options:

A.

Humidity

B.

Methane off-gassing

C.

Carbon dioxide concentrations

D.

Combustion processes from vehicles

Question 96

Light trespass beyond the project boundary can be prevented by the use of

Options:

A.

flood light fixtures

B.

up-lighting fixtures

C.

shielded light fixtures

D.

increasing the number of light fixtures